Renewable Energy Integration for Bulk Power Systems: ERCOT and the Texas Interconnection looks at the practices and changes introduced in the Texas electric grid to facilitate renewable energy integration. It offers an informed perspective on solutions that have been successfully demonstrated, tested, and validated by the Electric Reliability Council of Texas (ERCOT) to meet the key challenges which engineers face in integrating increased levels of renewable resources into existing electric grids while maintaining reliability. Coverage includes renewable forecasting, ancillary services, and grid and market operations. Proved methods and their particular use scenarios, including wind, solar, and other resources like batteries and demand response, are also covered. The book focuses on a real-world context that will help practicing engineers, utility providers, and researchers understand the practical considerations for developing renewable integration solutions and inspire the future development of more innovative strategies and theoretical underpinnings.
- ISBN:
- 9783031286384
- 9783031286384
-
Category:
- Alternative & renewable energy sources & technology
- Format:
- Hardback
- Publication Date:
-
13-05-2023
- Language:
- English
- Publisher:
- Springer International Publishing AG
- Country of origin:
- Switzerland
- Dimensions (mm):
- 235x155mm
- Weight:
- 0.62kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: