Free shipping on orders over $99
Need it for Christmas?
Renewable Power for Sustainable Growth

Renewable Power for Sustainable Growth

Proceedings of International Conference on Renewal Power (ICRP 2020)

by Atif IqbalHasmat Malik Ahmed Riyaz and others
Paperback
Publication Date: 05/05/2022

Share This Book:

  $264.27
or 4 easy payments of $66.07 with
afterpay
This item qualifies your order for FREE DELIVERY
Parameter Extraction of PV Cell: A Review.- A Comparative Study of Costs Function in Multivariate Stratified Double Sampling Design.- Power Transfer Enhancement by Simultaneous AC-DC Power Transmission-An Experimental Implementation.- Step by Step Design and Simulation of Boost Controller for L and LCL Filters for EV Fast Charging Systems.- A Novel High Gain Boost Converter for Interfacing Low Voltage PV in a DC Microgird.- Techno-Economic Analysis of Hybrid Rural Microgrid for Isolated Hilly Area in Indian Scenario.- Fabricated CdO-ZnO films: A Potential Candidate for Optoelectronics Applications.- Study of Different Topology for Multilevel Converter and Inverter Modulating in Cascaded H Bridge Solid State Transformer.- Image Refurbishing-An Efficient Object Removal and Region Filling Algorithm.- Analysis of Underground Renewable Energy Storage Tunnels Subjected to Capricious Superstructures.
ISBN:
9789813340824
9789813340824
Category:
Circuits & components
Format:
Paperback
Publication Date:
05-05-2022
Language:
English
Publisher:
Springer
Country of origin:
United States
Dimensions (mm):
235x155mm
Weight:
1.25kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Renewable Power for Sustainable Growth.