Since the 1970s, the IAEA has been involved in the analysis of fuel failures in water cooled reactors in normal (nonaccident) operational conditions. This updated version of IAEA Nuclear Energy Series No. NFT2.1 provides information on all aspects of fuel failures in current nuclear power plant operations. It summarizes fuel failure occurrences and their mechanisms and root causes, as well as fuel failure prevention and management in plant operation for 97% of light and heavy water cooled nuclear power units operated worldwide during the period 2006-2015. Data on fuel failures from 1987 to 2006 extracted from three previous IAEA fuel failure reports are included and analysed in the present publication, together with the 2006-2015 fuel failure data, to reveal long term tendencies in fuel performance. In addition to fuel rod leakers, fuel structural damages and other fuel assembly issues are considered in the report.
- ISBN:
- 9789204295207
- 9789204295207
-
Category:
- Nuclear power industries
- Format:
- Paperback
- Publication Date:
-
30-07-2022
- Publisher:
- IAEA
- Country of origin:
- Austria
- Pages:
- 84
- Dimensions (mm):
- 297x210mm
- Weight:
- 0.25kg
This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 3 - 5 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: