Free shipping on orders over $99
Road Tunnels

Road Tunnels

An Analytical Model for Risk Analysis

by Fabio BorghettiAlessio Frassoldati Paolo Cerean and others
Paperback
Publication Date: 30/04/2019

Share This Book:

  $101.07
or 4 easy payments of $25.27 with
afterpay
This item qualifies your order for FREE DELIVERY
This book illustrates a new quantitative risk analysis model for road tunnels that is capable of evaluating the role of infrastructure measures, equipment and management procedures as prescribed by EU Directive 2004/54/EC. The risk assessment draws on the typical F-N curves of societal risk, evaluated with the help of event tree analysis, vehicle queue formation dynamics, and users' egress and tenability models. In addition, the model considers the reliability of the safety measures. The work provides essential guidance on the following aspects: how a quantitative model can be implemented to evaluate risk in road tunnels; how to build an event tree for the accident scenarios considered; how to simulate the vehicle queue formation; how to simulate the evolution of accident scenarios; and how to simulate the users' egress. Given its scope and depth of coverage, the book will be of interest to all engineers whose work involves fire protection and safety in tunnels, all persons engaged in safety and transport engineering or risk analysis for road tunnels, as well as public and private bodies involved in the application of Directive 2004/54/EC.
ISBN:
9783030005689
9783030005689
Category:
Highway & traffic engineering
Format:
Paperback
Publication Date:
30-04-2019
Publisher:
Springer Nature Switzerland AG
Country of origin:
Switzerland
Pages:
117
Dimensions (mm):
235x155mm
Weight:
0.45kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Road Tunnels.