The Roof Construction Manual is a comprehensive reference work on the construction of pitched roofs, containing over 1800 plans and 220 photographs. Thirteen fundamental roof types and the relevant materials including thatch, wood, slate, tile, concrete, fibrous cement, bitumen, glass, metal, membranes, and synthetic materials are documented in detail. Essential topics such as ventilation, vapour and wind seals, insulation and drainage, renovation and energy conservation are examined. As with all the Construction Manuals, some 38 built examples illustrate the theoretical details, paying particular attention to important features such as the ridge, hip, eaves, roof valley, verge, and penetration. A compact presentation of the load-bearing physics and structures as well as current norms and standards make this volume an indispensable standard work for all architects and engineers.
- ISBN:
- 9783764369866
- 9783764369866
-
Category:
- Architectural structure & design
- Format:
- Hardback
- Publication Date:
-
25-08-2003
- Language:
- English
- Publisher:
- Birkhauser
- Country of origin:
- Switzerland
- Edition:
- 4th Edition
- Pages:
- 448
- Dimensions (mm):
- 292x235x32mm
- Weight:
- 2.36kg
This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: