Free shipping on orders over $99
Screening Tool for Energy Evaluation of Projects

Screening Tool for Energy Evaluation of Projects

A Reference Guide for Assessing Water Supply and Wastewater Treatment Systems

by Asian Development Bank
Paperback
Publication Date: 30/04/2021

Share This Book:

  $49.45
or 4 easy payments of $12.36 with
afterpay
This publication guides users on applying the Screening Tool for Energy Evaluation of Projects (STEEP), which is designed to support efforts to improve energy use efficiency in water and wastewater treatment systems.

The publication provides a detailed overview of STEEP and explains how to navigate the tool's various interfaces when conducting energy use assessments of proposed or existing water supply and wastewater treatment systems. Since 2017, STEEP has been under continuous development based on pilot assessments carried out in various projects financed by the Asian Development Bank. STEEP is available online and can be downloaded for free.
ISBN:
9789292627348
9789292627348
Category:
Water supply & treatment
Format:
Paperback
Publication Date:
30-04-2021
Publisher:
Asian Development Bank
Country of origin:
Philippines
Pages:
46
Dimensions (mm):
279x216x3mm
Weight:
0.17kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Screening Tool for Energy Evaluation of Projects.