Free shipping on orders over $99
Spillway Design - Step by Step

Spillway Design - Step by Step

by Geraldo Magela Pereira
Hardback
Publication Date: 25/02/2020

Share This Book:

  $375.85
or 4 easy payments of $93.96 with
afterpay
This item qualifies your order for FREE DELIVERY

Most dam accidents with hydroelectric plants are due to under-dimensioning of the maximum floods of spillway design, causing extravasation and dam breaks (this occurs in 23% of the accidents). This work highlights the relationship between spillway design and potential dam failure and other important aspects of these structures and presents the methodology of design based on the international experience on the subject.

The book covers river basin studies and floods (the geology, geomorphology, hydrology, hydraulics, and layouts of the works). Further, spillway function, capacity and design flood, layouts, or arrangements, of hydroelectric works and types of spillways are treated in the book. Finally, the book discusses examples of dams that broke due to insufficient spillway capacity.

The book is intended for engineers and the companies that design dams and power plants around the world, as well as students in dam and hydraulic engineering. In short, people interested in producing electricity that is clean and potentially cheaper than other sources.

ISBN:
9780367419363
9780367419363
Category:
Energy
Format:
Hardback
Publication Date:
25-02-2020
Language:
English
Publisher:
CRC Press LLC
Country of origin:
United States
Dimensions (mm):
247.65x171.45mm
Weight:
0.93kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Spillway Design - Step by Step.