Minutes before midnight on the evening of March 12, 1928, the St. Francis Dam collapsed. The dam's 200-foot concrete wall crumpled, sending billions of gallons of raging flood waters down San Francisquito Canyon, sweeping 54 miles down the Santa Clara River to the sea, and claiming over 450 lives in the disaster. Captured here in over 200 images is a photographic record of the devastation caused by the flood, and the heroic efforts of residents and rescue workers.Built by the City of Los Angeles' Bureau of Water Works and Supply, the failure of the St. Francis Dam on its first filling was the greatest American civil engineering failure of the 20th century. Beginning at dawn on the morning after the disaster, stunned local residents picked up their cameras to record the path of destruction, and professional photographers moved in to take images of the washed-out bridges, destroyed homes and buildings, Red Cross workers giving aid, and the massive clean-up that followed. The event was one of the worst disasters in California's history, second only to the San Francisco Earthquake and Fire.
- ISBN:
- 9781531614263
- 9781531614263
-
Category:
- History
- Format:
- Hardback
- Publication Date:
-
01-06-2003
- Publisher:
- Arcadia Publishing Library Editions
- Country of origin:
- United States
- Pages:
- 130
- Dimensions (mm):
- 244x170x10mm
- Weight:
- 0.41kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: