This book presents the work done by the RILEM Technical Committee 274-TCE. It focuses on the estimation of the parameters which are necessary to properly design earthen constructions. It provides a compilation of the value classically obtained for the key parameters of earthen materials, a pedagogical presentation of the main testing procedures for earthen materials, their advantage and their drawback and an overview of most standards on earthen materials, whatever their origin and their language.The book is divided into eight chapters. After a general introduction on earthen materials and constructions, the state of the art on the material characterisation technics, the assessment of hygrothermal performance, the mechanical behaviour, seismic resistance and the durability will be presented, each in a dedicated chapter. On the basis of these last chapters, a critical review of the standards which are used for earthen material will be presented in the last chapter. The last chapter is dedicated to the analysis of the environmental potential of earth-based building materials.
- ISBN:
- 9783030832995
- 9783030832995
-
Category:
- Building construction & materials
- Format:
- Paperback
- Publication Date:
-
28-11-2022
- Publisher:
- Springer Nature Switzerland AG
- Country of origin:
- Switzerland
- Pages:
- 296
- Dimensions (mm):
- 235x155mm
- Weight:
- 0.5kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: