The Crimean War, fought by the alliance of Great Britain, France, and the tiny Italian Kingdom of Piedmont-Sardinia alongside Turkey against Tsarist Russia, was the first 'modern' war, not only for its vast scale (France mobilised a million men) but also the technologies involved, from iron-clad battleships to rifled artillery, the electric telegraph and steam. Best known for the blunder of the Charge of the Light Brigade, the fearful conditions in the trenches at the front, and the quiet heroism of Florence Nightingale, the Crimean War saw the railway go to war for the first time. The Grand Crimean Central Railway was the brainchild of two Victorian railway magnates, Samuel Morton Peto and Thomas Brassey; in order to alleviate the suffering at the front, they volunteered to build at cost a steam railway linking the Allied camps at Sevastopol to their supply base at Balaclava. In the face of much official opposition, the railway was built and operational in a matter of months, supplying hundreds of tons of food, clothing and materiel to the starving and freezing men in their trenches. Largely worked by civilian auxiliaries, the Grand Crimean Central Railway saw the railway transformed into a war-winning weapon, saving countless thousands of lives as it did so.
- ISBN:
- 9781445671048
- 9781445671048
-
Category:
- Crimean War
- Format:
- Paperback
- Publication Date:
-
15-10-2019
- Language:
- English
- Publisher:
- Amberley Publishing
- Country of origin:
- United Kingdom
- Dimensions (mm):
- 234.95x165.1x7.62mm
- Weight:
- 0.28kg
This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 3 - 5 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: