Thomas Hackworth (1797-1877) has been overlooked by history. He had both the fortune and misfortune to be the brother of a renowned railway engineer. His fortune lay in that he was party to some of the most famous early railway experiments. He was there at the birth of Puffing Billy and Wylam Dilly and built some of the first locomotives used on the Stockton and Darlington Railway. He was still building steam locomotives long after railways had become the dominant form of transport in the world. He was a major contributor to the growth of the north-east towns of both Shildon and Stockton-on-Tees, which would not be what they are without his acumen and engineering expertise. In respect of Stockton, he was also responsible for establishing one of the world's leading marine engineering companies. His misfortune was that his life was eclipsed by the fame and genius of an older brother. It was brother Timothy who once referred to Thomas Hackworth as 'Poor Tom' when Tom was made the scapegoat for a series of problems at Shildon. As a consequence Tom lost both job and home, was subsequently exploited by his business partner, and saw his young family was devastated by cholera. Despite this, he built a hundred steam locomotives, operated some of the earliest railways and produced engines that powered the first steam ships It is time for Tom Hackworth's story to be told.
- ISBN:
- 9781781554647
- 9781781554647
-
Category:
- Biography: science
- Format:
- Paperback
- Publication Date:
-
15-06-2015
- Publisher:
- Fonthill Media Ltd
- Country of origin:
- United Kingdom
- Pages:
- 144
- Dimensions (mm):
- 234x156x10mm
- Weight:
- 0.33kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 1 - 2 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: