Tunnels and Underground Cities: Engineering and Innovation meet Archaeology, Architecture and Art. Volume 4: Ground Improvement in Underground Constructions contains the contributions presented in the eponymous Technical Session during the World Tunnel Congress 2019 (Naples, Italy, 3-9 May 2019).
The use of underground space is continuing to grow, due to global urbanization, public demand for efficient transportation, and energy saving, production and distribution. The growing need for space at ground level, along with its continuous value increase and the challenges of energy saving and achieving sustainable development objectives, demand greater and better use of the underground space to ensure that it supports sustainable, resilient and more liveable cities.
The contributions cover a wide range of topics, from permeation grouting and consolidation works, safety operations, artificial ground freezing to frost heave control.
The book is a valuable reference text for tunnelling specialists, owners, engineers, archaeologists, architects, artists and others involved in underground planning, design and building around the world, and for academics who are interested in underground constructions and geotechnics.
- ISBN:
- 9780367468682
- 9780367468682
-
Category:
- Waste management
- Format:
- Hardback
- Publication Date:
-
28-07-2020
- Publisher:
- Taylor & Francis Ltd
- Country of origin:
- United Kingdom
- Pages:
- 378
- Dimensions (mm):
- 246x174mm
- Weight:
- 0.8kg
This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: