The author proposes to base the synthetic reproduction of the television picture upon the optical and physiological actions of the motion picture projector of Mechau. This idea rests up on the high amount of correlation existing between the sequential images and on the inert visual perception of man, i. e. two facts which favour the introduction of an electrostatic memory device capable of modulating on each picture point its instantaneous brightness. In this system the whole number of surface elements of the screen stays simultaneously excited without any interruption of their appearance thereby suppressing the flicker and permitting a lower scanning rate with a corresponding reduction of the frequency band needed for the trans- mission of the picture signa!. Alike the Mechau-projector the frames follow each other in continuous superposition and progressive translucency along their succession. This impression is aided by a special form of interlacing line fields written down on the memory device. The picture is restored by a tube having a mosaic-like UV lighted photocathode which permits the loc al command of its emission to be projected on the screen without geo- metrie distortion. The principle described fits also for colour television. Resume L'auteur propose d'appliquer a la synthese de l'image de television les effets optiques et physiologiques du projecteur de cinema M echau.
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: