Wetlands have been used for uncontrolled wastewater disposal for centuries. However, the change in attitude towards wetlands during the 1950s and 1960s caused the minimization of the use of natural wetlands for wastewater treatment (at least in developed countries). Constructed wetlands have been used for wastewater treatment for about forty years. Constructed wetland treatment systems are engineered systems that have been designed and constructed to utilize the natural processes for removal of pollutants. They are designed to take advantage of many of the same processes that occur in natural wetlands, but do so within a more controlled environment. The aim of this book is to summarize the knowledge on horizontal s- surface flow constructed wetlands (HF CWs) and objectively evaluate their treatment efficiency under various conditions. The information on this type of wastewater treatment technology is scattered in many publications but a comprehensive summary based on world-wide experience has been lacking. The book provides an extensive overview of this treatment technology around the world, including examples from more than 50 countries and examples of various types of wastewater treated in HF CWs.
- ISBN:
- 9781402085796
- 9781402085796
-
Category:
- Pollution & threats to the environment
- Format:
- Hardback
- Publication Date:
-
28-07-2008
- Language:
- English
- Publisher:
- Springer-Verlag New York Inc.
- Country of origin:
- United States
- Pages:
- 566
- Dimensions (mm):
- 235x155x28mm
- Weight:
- 1.03kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: