This survey covers the field from the emergence of modern Arab economic dependence to the present mid-Eastern impasse. Alnasrawi contends that Arab economic development was shaped by Arab nationalist thought, the emergence of the oil industry in the Arab region, and the integration of Arab economies into the international economic system. The volume takes a look at the evolution of each of the three forces and details their impact on the development of the Arab economies, along with their present status. The contradictions between the needs of the single state and the needs of Arab economic integration, Arab unity, and pan-Arab economic planning receive special attention. Alnasrawi develops the concept of derivative dependency, illustrating the extent to which the economies of the non-oil states are being affected by what happens to the economies of the oil-producing states. The final chapter presents a detailed picture of the forces that led to the Iraqi invasion of Kuwait and integrates the events of August 1990 with the main themes of the book.
- ISBN:
- 9780313276101
- 9780313276101
-
Category:
- International economics
- Age range:
- + years old
- Format:
- Hardback
- Publication Date:
-
30-05-1991
- Publisher:
- Bloomsbury Publishing PLC
- Country of origin:
- United States
- Pages:
- 232
- Dimensions (mm):
- 240x163x23mm
- Weight:
- 0.57kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 1 - 2 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: